TY - JOUR
T1 - Lean Maintenance Roadmap
AU - Mostafa, Sherif
AU - Dumrak, Jantanee
AU - Soltan, Hassan
PY - 2015/1/1
Y1 - 2015/1/1
N2 - Maintenance shares significant operating costs in an organisation. It is considered as a main pillar of the organisational performance. Lean thinking can be incorporated into maintenance activities through applying its principles and practices. Lean maintenance is a prerequisite for lean manufacturing systems. The exhaustive literature review has been conducted to collect the up-to-date maintenance strategies and activities, lean principles and practices in the lean maintenance process. The scope of this paper includes eight types of waste (non-value added maintenance activities), maintenance value stream mapping and a scheme of lean maintenance practices. The output of this paper is a proposed roadmap to apply lean thinking in a maintenance process.
AB - Maintenance shares significant operating costs in an organisation. It is considered as a main pillar of the organisational performance. Lean thinking can be incorporated into maintenance activities through applying its principles and practices. Lean maintenance is a prerequisite for lean manufacturing systems. The exhaustive literature review has been conducted to collect the up-to-date maintenance strategies and activities, lean principles and practices in the lean maintenance process. The scope of this paper includes eight types of waste (non-value added maintenance activities), maintenance value stream mapping and a scheme of lean maintenance practices. The output of this paper is a proposed roadmap to apply lean thinking in a maintenance process.
KW - lean maintenance
KW - lean maintenance roadmap
KW - lean manufacturing
KW - Maintenance strategies
KW - maintenance value stream mapping
UR - http://www.scopus.com/inward/record.url?scp=85013157667&partnerID=8YFLogxK
UR - https://torrens.figshare.com/articles/Lean_Maintenance_Roadmap/7542179
U2 - 10.1016/j.promfg.2015.07.076
DO - 10.1016/j.promfg.2015.07.076
M3 - Article
AN - SCOPUS:85013157667
SN - 2351-9789
VL - 2
SP - 434
EP - 444
JO - Procedia Manufacturing
JF - Procedia Manufacturing
ER -